plop SPACEPHOTOS
 Untitled Document




   Accueil » Réf S08622 (détail)

 
Ma Planche Contact / Demande de Devis : $contenupl image(s)
Autre choix d'images dans ce thème
                        
Enregistrez gratuitement cette image
en 800 pixels pour usage maquette
(click droit, Enregistrer l'image sous...)



Réf : S08622

Thème : Astronautes Entrainement  (1725 images)

Titre : In the Operations and Checkout Building

Description : (La description de cette image n'existe qu'en anglais)

(07/12/2001) -- In the Operations and Checkout Building, STS-104 Pilot Charles O. Hobaugh gets help donning his launch and entry suit before heading to the launch pad. This launch will be his first space flight. Liftoff of Space Shuttle Atlantis on mission STS-104 is targeted for 5:04 a.m., July 12, from Launch Pad 39B. The primary payload on the mission is the joint airlock module, which will be added to the International Space Station. The airlock will be the primary path for Space Station spacewalk entry and departure for U.S. spacesuits, and will also support the Russian Orlan spacesuit for EVA activity